সরাসরি পর্বে যান
পর্ব ৭৩ · ৮৬-এর মধ্যে · মডিউল ১২

ML monitoring — service metric, model metric আর দেরিতে আসা ground truth

ML Monitoring — Service Metrics, Model Metrics and Delayed Ground Truth

Taught in Bangla, this lesson shows a model that looks healthy while it fails: all 3,101 replayed requests return HTTP 200 with p95 around 2.69 ms, yet the mean prediction is 0.3019 while the true late rate is 0.5881. It joins labels at arrival time, explains censoring bias from delayed ground truth, and fixes it with full cohorts, deadlines and completeness rates. It compares label-free signals with label-based ones, slices by segment, and decides what is an alert and what is a dashboard.

এই পর্বে যা শিখবেন

  • ML service-এর নজরদারির পাঁচটি স্তর, আর কেন service-এর metric সবুজ থাকলেও model ভুল হতে পারে
  • Prediction log থেকে monitoring-এর টেবিল বানানো, আর label-কে অর্ডারের নয়, পৌঁছানোর সময় ধরে জোড়া
  • দেরিতে আসা label-এর censoring bias মাপা, আর তা এড়ানোর নিয়ম: cohort-এর পূর্ণতা আর deadline-নিয়ম
  • Label ছাড়া মান অনুমান (CBPE), তার শর্ত আর ঈদের মতো ঘটনায় তার অন্ধত্ব
  • Segment ধরে নজরদারি, কোন সংকেতে alert আর কোনটি শুধু dashboard-এ, আর কে মালিক

১ · Service সবুজ, model লাল — ML-এর নজরদারি আলাদা কেন

মডিউল ১১-এ বাজারঘরের late-delivery model ক্রেতার সামনে এসেছে: FastAPI-তে online serving (পর্ব ৬৭), রাতের batch scoring (পর্ব ৬৮), আর ধাপে ধাপে release (পর্ব ৭২)। এবার প্রশ্ন বদলায়: model চালু হওয়ার পরের প্রতিটি দিন সে ঠিকঠাক আছে কি না, তা কীভাবে জানবেন? এই কাজের নাম model monitoring.

সাধারণ service-এর নজরদারি এই কোর্সের বাইরে আগেই শেখানো হয়েছে: Prometheus-এর counter, histogram আর PromQL Cloud & DevOps-এর পর্ব ৬৩-এ, SLO, burn rate আর alert Cloud & DevOps-এর পর্ব ৬৬-এ, আর log, metric, trace-এর বড় ছবি System Design-এর পর্ব ৫০-এ। Machine Learning কোর্সের পর্ব ৬৯-এর §৫ নজরদারির চার স্তরের ধারণা দিয়েছে। এখানে সেগুলো আবার নয়। এই পর্বের প্রশ্ন একটিই: model হলে নজরদারিতে কী বাড়তি লাগে, আর ground truth (আসল ফল) দেরিতে এলে কী হয়?

আবহাওয়া অফিসের কথা ভাবুন। প্রতিদিন সকাল ৬টায় পূর্বাভাস বের হয়, একটিও বাদ নেই — এটি “service” ঠিক থাকা। পূর্বাভাস ঠিক ছিল কি না, জানা যায় পরের দিন বৃষ্টি হলে, কোনো জেলার খবর আরও দুই দিন পরে। বর্ষা শুরু হলে পুরোনো নিয়মের পূর্বাভাস সময়মতো, পরিষ্কার ভাষায়, ভুল বলবে; টের পাবেন শুধু যিনি বৃষ্টির খাতা মেলান।

বাজারঘরে ঠিক এটাই ঘটেছে। ল্যাবে মার্চের সব অর্ডার নতুন করে API-তে পাঠানো হয়েছে (অংশ ২)। Service-এর দিক থেকে ছবিটি নিখুঁত, Prometheus-এর /metrics থেকে সত্যিকারের অংশ:

late_predictions_total{label="on_time",model_version="1"} 2282.0
late_predictions_total{label="late",model_version="1"} 819.0
predict_latency_seconds_bucket{le="0.0025"} 2317.0
predict_latency_seconds_bucket{le="0.005"} 3093.0
predict_latency_seconds_bucket{le="+Inf"} 3101.0
predict_latency_seconds_sum 7.498261226079194
replayed 3101 requests in 10.6 s; status codes {200: 3101}

৩,১০১টি অনুরোধের ৩,০৯৩টি ৫ ms-এর মধ্যে, গড় প্রায় ২.৪ ms, একটিও error নেই। ঈদের দশ দিনে model-এর নিজের সময়ের p95 ছিল ২.৬৯ ms — সাধারণ দিনের চেয়েও কম। RED-এর তিনটি প্রশ্নের (rate, error, duration) উত্তরই সবুজ। অথচ সেই দশ দিনে model গড়ে ০.৩০১৯ সম্ভাবনা বলেছে, আর আসলে দেরিতে পৌঁছেছে ০.৫৮৮১ অর্ডার (README-র §৬-এর সংখ্যা)। এটি silent failure: কোনো error নেই, শুধু ভুল সংখ্যা।

ML service-এর নজরদারির পাঁচ স্তর, আর ঈদের ভিড়ে কোনটি কী দেখাল

ওপরে দ্রুত কিন্তু পরোক্ষ · নিচে ধীর কিন্তু সরাসরি

নজরদারির পাঁচ স্তর আর ঈদের ভিড় ১ · Service (সেবা) latency, error, অনুরোধের হার সেকেন্ডে · ঈদে সবুজ: p95 2.69 ms, error 0 ২ · ইনপুট ডেটা আয়তন, schema, feature-এর বণ্টন (PSI) দিনের শেষে · ঈদে লাল: zone PSI 0.2455 ৩ · অনুমান (prediction) গড় সম্ভাবনা, flagged অংশ দিনের শেষে · ঈদে অস্পষ্ট: 0.3019 বনাম 0.2340 ৪ · Model-এর মান (label লাগে) calibration, Brier, AUC, segment ২–৭ দিন পরে · Brier 0.2855, AUC 0.7451 ৫ · ব্যবসার ফল অভিযোগ, ফেরত, dispatcher-এর কাজ সপ্তাহে · এই ল্যাবে মাপা হয়নি ওপর থেকে নিচে: দ্রুততা কমে, সরাসরি প্রমাণ বাড়ে

ওপরের স্তরের সংকেত মিনিটে আসে কিন্তু “মান কমেছে” প্রমাণ করে না; নিচের স্তর প্রমাণ দেয়, কিন্তু দিন বা সপ্তাহ পরে। এই পর্বের কাজ এই ফাঁকের ভেতরে: দ্রুত সংকেতে সন্দেহ, দেরিতে আসা ground truth-এ নিশ্চয়তা।

স্তরঈদে (১০–১৯ মার্চ) কী দেখালঠিক কী বলে
Serviceerror ০, p95 ২.৬৯ msAPI চলছে; model ঠিক কি না, কিছুই নয়
ইনপুটদিনে অর্ডার গড়ে ১০০.৫ (আগে ৬২.২); zone PSI ০.২৪৫৫, ঘণ্টার PSI ০.১০৫০পৃথিবী বদলেছে; model-এর ক্ষতি হয়েছে কি না, তা নয়
অনুমানগড় ০.৩০১৯, flagged অংশ ০.৩৪৪৩model কিছুটা নড়েছে, কিন্তু যথেষ্ট কি না, অজানা
মান (label)Brier ০.১৪৯১ → ০.২৮৫৫, log loss ০.৪৬৩৩ → ০.৭৯৩৯; AUC ০.৭৫২২ → ০.৭৪৫১ক্রম ঠিক আছে, calibration ভেঙেছে
ব্যবসা(এই ল্যাবে মাপা নয়)dispatcher ভুল অর্ডারে সময় দিলেন কি না

২ · Lab: prediction log, আর label জোড়া লাগে পৌঁছানোর সময়ে

পুরো পর্বের পরীক্ষা চলেছে WSL-এ, নিজের ফোল্ডার ~/lab-এ: README-র নিয়মে ডেটা, dbt build (২৪টির ২৪টি সফল), train.py দিয়ে নিজের MLflow store-এ late-delivery v1, alias champion, আর drift.py-এর PSI টেবিল README-র সঙ্গে হুবহু (eid_rush-এ zone ০.২৪৫৫, hour ০.১০৫০)। Tool: scikit-learn 1.9.1, pandas 2.3.3, DuckDB 2.0.1, MLflow 3.18.0, FastAPI 0.165.0, uvicorn 0.54.0, prometheus-client 0.24.1.

Serving-এ README-র §৭-এর app-এর একটি কপি, দুটি বদলসহ: প্রতিটি অনুরোধে পর্ব ৬৭-এর ঘর নিয়ে একটি prediction log-এর লাইন, আর client ঘণ্টা নয়, অর্ডারের UTC মুহূর্ত (ordered_at) পাঠায় — server নিজে ঢাকার ঘণ্টা আর শুক্রবার বানায়। App চলেছে 127.0.0.1:9022-এ, শেষে PID ধরে বন্ধ।

Replay-এর পদ্ধতি: fct_deliveries-এর ঢাকার তারিখ ২০২৬-০২-১৫ থেকে ০৩-৩১-এর সব অর্ডার, অর্থাৎ ৩,১০১টি (valid-এর ৮৩৪ + মার্চের ২,২৬৭), order_ts-এর ক্রমে একটির পর একটি। প্রতিটি অনুরোধে ordered_at = order_ts আর request_id = chk-<order_id>. Label কখনো পাঠানো হয় না। অর্থাৎ প্রতিটি অর্ডার ঠিক সেই মুহূর্তের মতো score হলো, যখন ক্রেতা checkout করেছিলেন। বাতিল অর্ডারের delivery নেই, তাই label-ও নেই; সেগুলো এই replay-এ নেই (এটি নিজেই একটি সীমা, প্রশ্ন ২-এ)।

ঈদের দ্বিতীয় দিনের একটি অর্ডারের লাইন, log থেকে হুবহু:

{"ts": "2026-03-10T23:07:18Z", "request_id": "chk-104467", "model_version": 1,
 "courier": "drut", "payment_method": "nagad", "zone": "3", "parcel_weight_kg": 8.48,
 "order_hour_dhaka": 5.0, "promised_days": 3.0, "is_friday": 0.0, "is_night": 0.0,
 "order_date_dhaka": "2026-03-11", "p": 0.2784, "label": "on_time", "model_ms": 2.167}

UTC-তে ১০ মার্চ রাত ১১টা, ঢাকায় ১১ মার্চ ভোর ৫টা ৭ মিনিট — তাই order_date_dhaka ১১ মার্চ। এই পর্বের সব দিন ঢাকার দিন; সব সময়-চিহ্ন UTC-তে রাখা। Log থেকে চার জানালার মান আবার গোনা হলো, যাতে নিশ্চিত হওয়া যায় serving-এর পথ training-এর feature-ই বানাচ্ছে:

window valid      {'n': 834,  'late': 0.2566, 'mean_p': 0.234,  'flag': 0.2134, 'brier': 0.1641, 'auc': 0.7365}
window mar_normal {'n': 560,  'late': 0.2304, 'mean_p': 0.2384, 'flag': 0.2143, 'brier': 0.1491, 'auc': 0.7522}
window eid_rush   {'n': 1005, 'late': 0.5881, 'mean_p': 0.3019, 'flag': 0.3443, 'brier': 0.2855, 'auc': 0.7451}
window after_eid  {'n': 702,  'late': 0.2792, 'mean_p': 0.2478, 'flag': 0.2493, 'brier': 0.1695, 'auc': 0.7532}

প্রতিটি সংখ্যা README-র §৬-এর সঙ্গে হুবহু। কিন্তু এই টেবিলটি পেছন ফিরে দেখা: সব label হাতে, কারণ আমরা এপ্রিলের পরে বসে আছি। ১৩ মার্চ সকালে কোনো dashboard এটি দেখাতে পারত না।

Label কখন “জানা” হয় — দুই নিয়ম

বাজারঘরে একটি অর্ডারের ground truth হলো is_late, যা deliveries-এ লেখা হয় পার্সেল পৌঁছালে। Monitoring-এর জন্য তাই প্রতিটি label-এর একটি label arrival time চাই: যে মুহূর্ত থেকে আমরা ফলটি জানি।

  • নিয়ম A (পৌঁছানো): label জানা হয় delivered_ts-এ। সরল, আর প্রায় সব দোকান এটাই করে।
  • নিয়ম B (deadline): দেরি মানে প্রতিশ্রুত দিনের ঢাকার মধ্যরাত পেরিয়েও না পৌঁছানো। তাই সেই মধ্যরাত পেরোলেই “দেরি” নিশ্চিত, পার্সেল পথে থাকলেও। সময়মতোর খবর আসে পৌঁছালে। এটি পর্ব ৬০-এর censored label-এর ধারণা, এখানে monitoring-এ।

নিয়ম B বিশ্বাস করার আগে ডেটায় যাচাই: সময়মতো কোনো পার্সেল deadline-এর পরে পৌঁছেছে কি না, আর দেরির কোনোটি আগে। ফল check on-time before deadline: 0 | late after deadline: 0 — একটিও ব্যতিক্রম নেই। মার্চের অর্ডারে label-এর দেরি:

label delay hours (March, rule A): median 51.7 max 164.0 | rule B: median 47.9 max 96.0
delay by class rule A: on_time median 32.6 h, late median 107.8 h

নিয়ম A-তে সবচেয়ে দেরির label আসে ১৬৪ ঘণ্টা, প্রায় সাত দিন পরে (পর্ব ৬৩-এ পুরো ডেটায় মাপা সর্বোচ্চ ৬.৮৪ দিন)। তাই নিয়ম B-ই এই দোকানের সঠিক label-ঘড়ি: একটি label ঠিক যে মুহূর্তে চূড়ান্ত হয়, তখনই তাকে জানা ধরে। নিয়ম A শুধু “পৌঁছানো” দেখে, তাই দেরির খবর অকারণে পিছিয়ে দেয় — তবু বহু দলের pipeline এভাবেই চলে, তাই দুটিই পাশাপাশি দেখানো হলো। নিয়ম B সর্বোচ্চ দেরি ৯৬ ঘণ্টায় নামায়: zone ৩-এর তিন দিনের প্রতিশ্রুতি + অর্ডারের দিনটি। কিন্তু দ্বিতীয় লাইনটিই এই পর্বের বীজ: সময়মতো পার্সেলের label আসে মাঝামাঝি ৩২.৬ ঘণ্টায়, দেরির label ১০৭.৮ ঘণ্টায়। Label-এর দেরি label-এর মানের ওপর নির্ভর করে।

একটি অর্ডার ধরে পুরো পথ দেখুন — ওপরের লাইনের অর্ডার ১০৪৪৬৭, log আর fct_deliveries থেকে:

order 104467 · drut · zone 3 · ৮.৪৮ kg · সময় ঢাকার
কখন
model-এর খাতা
নিয়ম A
নিয়ম B
নজরদারি
  1. Score. ভোর ৫টা ৭ মিনিটে checkout. Model বলল ০.২৭৮৪, ০.৩৫-এর নিচে, তাই on_time. Service-এর চোখে নিখুঁত: HTTP 200, model-এর কাজ ২.১৭ ms. Log-এ লাইন লেখা হলো, label-এর ঘর নেই।
  2. দিনের হিসাব. রাতের job ১১ মার্চের ১০২টি অর্ডারের গড় অনুমান ০.৩৩৮২, flagged অংশ ০.৩৮২৪ আর zone PSI ০.৪৩৫০ গুনল। এই অর্ডার সেই গড়ের অংশ, কিন্তু তার ফল কেউ জানে না।
  3. Deadline. Zone ৩-এর প্রতিশ্রুতি তিন দিন: ১৪ মার্চ শেষ হলো, পার্সেল পৌঁছায়নি। নিয়ম B এখনই বলে “দেরি নিশ্চিত”, অর্ডারের ৯০.৯ ঘণ্টা পরে। নিয়ম A এখনো অপেক্ষায়।
  4. পৌঁছানো. বিকেল ৪টা ১২-তে পার্সেল পৌঁছাল; deliveries-এ is_late = 1. নিয়ম A-র label এল অর্ডারের ১০৭.১ ঘণ্টা পরে। Model এই অর্ডারে ভুল করেছিল: এটি একটি false negative.
  5. Label জোড়া. রাতের job ১৫ মার্চে আসা ৮২টি label (নিয়ম A) জুড়ল: তাদের আসল দেরির হার ০.৪৬৩৪, আর সেই অর্ডারগুলোর গড় অনুমান ০.২৮০০। ফাঁক ০.১৮৩৪ — নিয়ম A-তে ঈদের প্রথম alarm-এর দিন (অংশ ৪)।

রাতের job-এর মূল অংশ ছোট: log আর deliveries জোড়া, তারপর “আজ পর্যন্ত কী জানা ছিল” তা কেটে নেওয়া। আসল কোড থেকে:

DH = pd.Timedelta(hours=6)                         # Dhaka = UTC+6, no DST
d = log.merge(lab, on='order_id', how='left')      # lab: order_id, delivered_ts, is_late
d['deadline'] = (d.odate + pd.to_timedelta(d.promised_days + 1, unit='D')
                 ).dt.tz_localize('UTC') - DH      # Dhaka midnight after the promised day
d['arr_A'] = d.delivered_ts                        # rule A: known on delivery
d['arr_B'] = np.where(d.is_late == 1, d.deadline, d.delivered_ts)   # rule B
...
cut = pd.Timestamp(D, tz='UTC') + pd.Timedelta(days=1) - DH   # end of Dhaka day D
k = placed[placed['arr_' + R] < cut]               # what a dashboard could know that night

শেষ লাইনের cut-ই সব। এটি ছাড়া যে কোনো query নিজের অজান্তে ভবিষ্যৎ দেখে। পর্ব ৬০-এর point-in-time join-এর একই নীতি, শুধু এবার feature নয়, মূল্যায়নের জন্য।

৩ · দেরিতে আসা label-এর ফাঁদ — censoring bias

সময়মতো পার্সেল দ্রুত পৌঁছায়, তাই তার খবর আগে আসে। দেরির পার্সেলের খবর আসে শেষে। ফলে যে কোনো দিন “এখন পর্যন্ত জানা label” সময়মতো পার্সেলের দিকে হেলে থাকে, আর দেরির হার আসলের চেয়ে কম দেখায়। একে বলা হয় censoring bias: যাদের ফল এখনো দেখা যায়নি (censored), তারা এলোমেলো নয়, তারা বিশেষ এক দল। পর্ব ৬০-এ একই হেলে থাকা একটি feature-এ (courier-এর ৭ দিনের দেরির হার) দেখেছেন; এখানে সেটি model-এর মূল্যায়নে, আর ক্ষতি আরও বড়।

বোর্ড পরীক্ষার ফল যেন স্কুলে স্কুলে আলাদা দিনে আসে, আর যে স্কুলের ছাত্ররা ভালো করেছে, তাদের খাতা আগে দেখা শেষ হয়। প্রথম দিনের তালিকা দেখে কেউ যদি বলেন “এ বছর পাসের হার ৯৮%”, তিনি মিথ্যা বলেননি, শুধু তালিকাটি এখনো অসম্পূর্ণ, আর অসম্পূর্ণতা একদিকে হেলানো।

ল্যাবে মাপা হলো: প্রতিটি অর্ডারের দিন d-এর জন্য, d+h দিনের শেষে কত label জানা, আর তাদের দেরির হার কত। দুই জানালা, দুই নিয়ম (সত্যিকারের run):

censoring mar_normal rule A: final late 0.2304 mean_p 0.2384 n 560
 h  known_share  known_late  known_mean_p
 1       0.4464      0.0000        0.1495
 3       0.8232      0.0651        0.2034
 5       0.9661      0.2033        0.2293
 7       1.0000      0.2304        0.2384
censoring eid_rush rule A: final late 0.5881 mean_p 0.3019 n 1005
 h  known_share  known_late  known_mean_p
 1       0.2229      0.0000        0.1513
 3       0.5144      0.1992        0.2201
 5       0.8736      0.5285        0.2809
 7       1.0000      0.5881        0.3019
censoring eid_rush rule B: final late 0.5881 mean_p 0.3019 n 1005
 h  known_share  known_late  known_mean_p
 1       0.2229      0.0000        0.1513
 3       0.6647      0.3802        0.2276
 4       1.0000      0.5881        0.3019

লক্ষ করুন: পরের দিন যত label জানা, তার একটিও দেরির নয়। ঈদে তিন দিনে অর্ধেক label জানা, তাদের দেরির হার ০.১৯৯২, অথচ আসল ০.৫৮৮১। আর জানা label-গুলোর অনুমানও কম (০.২২০১), তাই “জানা অংশে অনুমান বনাম আসল” মেলালেও তিন দিনের মাথায় model-কে উল্টো দোষ দেওয়া হবে — যেন সে বেশি বলছে।

eid_rush · অর্ডারের দিন d থেকে d+h দিনের শেষে · আসল দেরি 0.5881
h
নিয়ম A: জানা
নিয়ম A: দেরির হার
জানাদের গড় অনুমান
নিয়ম B: জানা · হার
  1. পরের দিন. ২২.২৯% label জানা, সবকটি সময়মতো। দেরির হার ০, জানাদের গড় অনুমান ০.১৫১৩। Dashboard দেখাবে “model বেশি ভয় পাচ্ছে”।
  2. দুই দিন. নিয়ম A-তে ৩৭.৩১% জানা, হার ০.০৩২০। নিয়ম B-তে zone ১-এর deadline পেরিয়েছে, তাই সেখানকার দেরির খবর এসেছে: ৪২.৩৯%, হার ০.১৪৭৯।
  3. তিন দিন. অর্ধেক জানা (৫১.৪৪%), হার ০.১৯৯২ — এখনো জানাদের অনুমানের (০.২২০১) নিচে। নিয়ম B-তে ৬৬.৪৭%, হার ০.৩৮০২, এবার স্পষ্ট ফাঁক।
  4. চার দিন. নিয়ম B সম্পূর্ণ: সব deadline পেরিয়েছে, তাই ১০০% জানা, হার ০.৫৮৮১ — সত্য। নিয়ম A-তে এখনো ৭০.৩৫%, হার ০.৪১৪৪।
  5. পাঁচ দিন. নিয়ম A ৮৭.৩৬%, হার ০.৫২৮৫; প্রায় পৌঁছে গেছে, কিন্তু বাকি ১৩%-এর বেশিরভাগই দেরির।
  6. সাত দিন. নিয়ম A-ও সম্পূর্ণ, ০.৫৮৮১। এতদিনে ঈদের ভিড় শেষ। সত্য এসেছে, কিন্তু কাজে লাগার সময় পেরিয়ে গেছে।

নিচের ব্লকে একই ঘটনা ছোট আকারে, SQL-এ: ঈদের দ্বিতীয় দিন (ঢাকার অর্ডার-তারিখ ১১ মার্চ) zone ৩-এর ৫৩টি অর্ডার, ল্যাবের prediction log আর fct_deliveries থেকে কাটা আসল সারি। প্রথম query পেছন ফিরে দেখে; দ্বিতীয়টি প্রতিটি ঢাকার দিনের শেষে (UTC 18:00) যা জানা ছিল, শুধু তা-ই নেয়:

-- ১) পেছন ফিরে দেখা (hindsight): সব label হাতে, যা পরে জানা যাবে
SELECT COUNT(*) AS orders, ROUND(AVG(is_late), 4) AS final_late_rate,
       ROUND(AVG(p), 4) AS mean_pred
FROM preds;

-- ২) প্রতিটি ঢাকার দিনের শেষে (UTC 18:00) যা জানা ছিল
--    নিয়ম A: label আসে delivered_utc-তে
--    নিয়ম B: দেরি নিশ্চিত হয় প্রতিশ্রুত দিনের শেষে (deadline)
WITH days(d) AS (VALUES ('2026-03-12'), ('2026-03-13'), ('2026-03-14'),
                        ('2026-03-15'), ('2026-03-16'), ('2026-03-17')),
lab AS (
  SELECT *, datetime(date(order_utc, '+6 hours'),
                     '+' || (promised_days + 1) || ' days', '-6 hours') AS deadline_utc
  FROM preds),
k AS (
  SELECT d, lab.*,
         delivered_utc < datetime(d, '+18 hours') AS known_a,
         CASE WHEN is_late = 1 THEN deadline_utc < datetime(d, '+18 hours')
              ELSE delivered_utc < datetime(d, '+18 hours') END AS known_b
  FROM days CROSS JOIN lab)
SELECT d AS dhaka_day_end,
       SUM(known_a) AS known_a,
       ROUND(AVG(CASE WHEN known_a = 1 THEN is_late END), 4) AS late_a,
       ROUND(AVG(CASE WHEN known_a = 1 THEN p END), 4) AS pred_a,
       SUM(known_b) AS known_b,
       ROUND(AVG(CASE WHEN known_b = 1 THEN is_late END), 4) AS late_b
FROM k GROUP BY d ORDER BY d;

আসল আউটপুট (ব্রাউজারের SQLite):

orders  final_late_rate  mean_pred
53      0.6792           0.4555

dhaka_day_end  known_a  late_a  pred_a  known_b  late_b
2026-03-12     0        NULL    NULL    0        NULL
2026-03-13     9        0       0.3302  9        0
2026-03-14     17       0       0.3243  17       0
2026-03-15     24       0.2917  0.3771  53       0.6792
2026-03-16     37       0.5405  0.4211  53       0.6792
2026-03-17     53       0.6792  0.4555  53       0.6792

১৪ মার্চের রাতে ১৭টি label জানা, সবকটি সময়মতো, অথচ তাদের গড় অনুমান ০.৩২৪৩ — দেখে মনে হবে model অকারণে ভয় দেখাচ্ছে। পরের দিনই নিয়ম B-তে বাকি ৩৬টির deadline পেরোয়: ৫৩-র ৫৩, হার ০.৬৭৯২, যা পেছন ফিরে দেখা সংখ্যার সমান। নিয়ম A-তে একই জায়গায় পৌঁছাতে ১৭ মার্চ লাগল। datetime(d, '+18 hours') হলো ঢাকার দিন d-এর শেষ মুহূর্ত, UTC-তে।

প্রতিকার: পূর্ণ cohort, deadline আর পূর্ণতার হার

Censoring bias থেকে বাঁচার তিনটি অভ্যাস, ল্যাবের সংখ্যা দিয়ে:

  1. শুধু পূর্ণ cohort-এর মান রিপোর্ট করুন: একটি অর্ডারের দিনকে (cohort) তখনই মূল্যায়ন করুন যখন তার সব label আসা সম্ভব — নিয়ম A-তে ৭ দিন, নিয়ম B-তে ৪ দিন পরে। একে বলে cohort maturity; দাম, খবর দেরিতে আসে।
  2. Deadline-নিয়ম ব্যবহার করুন: পূর্ণতার সময় ৭ থেকে ৪ দিনে নামল, কোনো ভুল ঢুকল না (ব্যতিক্রম ০)।
  3. প্রতিটি সংখ্যার পাশে পূর্ণতার হার লিখুন: “দেরির হার ০.১৯৯২ (৫১% label এসেছে)” কেউ সত্য ভাববে না। হারটি নিজেও সংকেত: ঈদে তিন দিনে ৫১%, সাধারণ সময়ে ৮২%.

৪ · মার্চ দিনে দিনে — label ছাড়া সংকেত বনাম label-এর সংকেত

এবার on-call প্রকৌশলীর চোখে: ১০ মার্চ ঈদের ভিড় শুরু হলো। কোন সংকেত কবে বাজত? রাতের job প্রতিটি ঢাকার দিনের জন্য দুই ধরনের সংখ্যা লিখেছে:

  • সেদিন score হওয়া অর্ডার থেকে (label লাগে না): গড় অনুমান, flagged অংশ (p ≥ ০.৩৫), আর train জানালার তুলনায় zone-এর PSI — drift.py-এর একই নিয়মে। এগুলো proxy metric: আসল মান নয়, তার ইঙ্গিত। গড় অনুমান আর flagged অংশের বদলকে prediction drift বলে।
  • সেদিন আসা label থেকে: সেদিন যত label এসেছে, তাদের আসল দেরির হার বিয়োগ তাদের গড় অনুমান। একে বলছি label-এর ফাঁক (gap); শূন্যের কাছে মানে model calibrated. নিয়ম A আর B দুটোতেই।

সীমাগুলো valid জানালার (১৫–২৮ ফেব্রুয়ারি) দৈনিক মান দেখে বাছা: সেখানে সবচেয়ে বেশি গড় অনুমান ০.৩০০১, flagged অংশ ০.৩৮১০, zone PSI ০.০৯৩৪, আর নিয়ম A-র ফাঁক −০.১৬৪৮ থেকে ০.০৬৪৭। তাই সীমা: গড় > ০.৩০, flagged > ০.৩৮, zone PSI > ০.১০, ফাঁক > ০.১৫। Drift-এর মাপ আর তার সীমার নীতি পর্ব ৭৪-এ বিস্তারিত।

মার্চের প্রতিটি ঢাকার দিন: zone PSI আর label-এর ফাঁক (সত্যিকারের run)

নীল: zone PSI · লাল: ফাঁক, নিয়ম A · বেগুনি ড্যাশ: ফাঁক, নিয়ম B · লাল ড্যাশ রেখা: ০.১৫ · ধূসর ডট রেখা: ০.১০

মার্চে zone PSI আর label-এর ফাঁক ঈদের ভিড় -0.1 0.0 0.1 0.2 0.3 0.4 ১ ১০ ২০ ৩১ মার্চের ঢাকার দিন zone PSI · প্রথম পার: ১০ মার্চ ফাঁক, নিয়ম A · প্রথম পার: ১৫ মার্চ ফাঁক, নিয়ম B · প্রথম পার: ১৩ মার্চ

Input-এর সংকেত (নীল) ঈদের প্রথম দিনেই লাফায় আর ভিড় শেষে নামে — দ্রুত, কিন্তু শুধু বলে “পৃথিবী বদলেছে”। Label-এর সংকেত কয়েক দিন পরে ওঠে আর ভিড়ের পরেও পাঁচ দিন উঁচু থাকে, কারণ দেরির পার্সেল তখনো পৌঁছাচ্ছে। গুরুত্বপূর্ণ দিনগুলো, ল্যাবের দৈনিক টেবিল থেকে:

সীমা: গড় > 0.30 · flagged > 0.38 · zone PSI > 0.10 · ফাঁক > 0.15
ঢাকার দিন
গড় · flagged
zone PSI
ফাঁক A · B
বাজল
  1. ৬ মার্চ, সাধারণ শুক্রবার. গড় অনুমান ০.৩২০২ আর flagged ০.৩৮৭১ — দুটিই সীমা পেরোল। কিন্তু কিছুই ভাঙেনি: শুক্রবারে অর্ডারের ধরন আলাদা, model ঠিকভাবেই বেশি ঝুঁকি বলছে। এটি মিথ্যা alarm, আর alert fatigue-এর শুরু।
  2. ১০ মার্চ, ঈদের প্রথম দিন. অর্ডার ৮৯টি, দূরের জেলার অর্ডার বেড়েছে: zone PSI ০.১৭০৬, সীমা পার। গড় অনুমান কিন্তু মাত্র ০.২৫৪৩ — model প্রায় নড়েনি। Label-এর সংকেত চুপ, কারণ এখনো কোনো ঈদের পার্সেল পৌঁছায়নি।
  3. ১১ মার্চ. PSI ০.৪৩৫০, মাসের সর্বোচ্চ। গড় আর flagged-ও সীমা পেরোল। Label-এর ফাঁক উল্টো, −০.০৪১৯: সেদিন যা পৌঁছেছে তা মূলত আগের সপ্তাহের আর ঈদের দ্রুত পার্সেল।
  4. ১৩ মার্চ, ঈদের শুক্রবার. নিয়ম B-র ফাঁক ০.১৬০২: zone ১ আর ২-এর ঈদের deadline পেরিয়েছে, দেরির খবর আসছে। নিয়ম A-র ফাঁক ০.১০৭৫, এখনো সীমার নিচে।
  5. ১৫ মার্চ. নিয়ম A-ও পার: ৮২টি label, ফাঁক ০.১৮৩৪। ঈদ শুরুর পাঁচ দিন পরে label-ভিত্তিক প্রমাণ এল। গড় অনুমান (০.২৯৮৪) আর flagged (০.৩৩০৫) আজ সীমার নিচে — proxy-গুলো অনিয়মিত।
  6. ২০ মার্চ, ভিড় শেষ. PSI নেমে ০.০৫৫১, input স্বাভাবিক। কিন্তু label-এর ফাঁক এখনো উঁচু (০.২৯৫৮ আর ০.৩২৩০, নিয়ম B-র মাসের সর্বোচ্চ): ঈদের দেরির পার্সেল এখন পৌঁছাচ্ছে। ভুল সময়ে ভুল বার্তা — “এখন model ভাঙছে”।
  7. ২৫ মার্চ. সব শান্ত, ফাঁক ০.০২১৩। নিয়ম A-র alarm চলেছে ১৫ থেকে ২৪ মার্চ, অর্থাৎ ভিড়ের পাঁচ দিন পরে শুরু, পাঁচ দিন পরে শেষ।

নিচের ব্লকে মার্চের পুরো দৈনিক টেবিল (ল্যাবের daily.csv, ৩১টি সারি, কোনো সংখ্যা হাতে লেখা নয়) আর পাঁচটি alert নিয়ম। FOR_DAYS = 2 করে দেখুন: Prometheus-এর for:-এর মতো, নিয়ম পরপর দুই দিন সত্য হলে তবেই বাজবে।

# Five alert rules on the REAL March daily series of the lab (Dhaka days; labels joined by arrival time)
import csv
days = list(csv.DictReader(open("march_daily.csv")))
EID = {f"03-{d}" for d in range(10, 20)}

rules = [  # (name, column, threshold)
    ("mean prediction > 0.30", "mean_p", 0.30),
    ("flagged share > 0.38", "flag", 0.38),
    ("zone PSI > 0.10", "psi_zone", 0.10),
    ("label gap A > 0.15", "gap_a", 0.15),
    ("label gap B > 0.15", "gap_b", 0.15),
]
FOR_DAYS = 1          # try 2: the rule must hold two days in a row before it fires

for name, col, th in rules:
    run, fired = 0, []
    for r in days:
        run = run + 1 if float(r[col]) > th else 0
        if run >= FOR_DAYS:
            fired.append(r["day"])
    first_eid = next((d for d in fired if d in EID), "never")
    false = [d for d in fired if d < "03-10"]
    after = [d for d in fired if d > "03-19"]
    print(f"{name:<23} first Eid alarm {first_eid:<6} | Eid days {sum(d in EID for d in fired):>2}/10"
          f" | before Eid {false} | after Eid {len(after)} day(s)")

আসল আউটপুট (ব্রাউজারের Python):

mean prediction > 0.30  first Eid alarm 03-11  | Eid days  3/10 | before Eid ['03-06'] | after Eid 1 day(s)
flagged share > 0.38    first Eid alarm 03-11  | Eid days  2/10 | before Eid ['03-06'] | after Eid 0 day(s)
zone PSI > 0.10         first Eid alarm 03-10  | Eid days 10/10 | before Eid [] | after Eid 1 day(s)
label gap A > 0.15      first Eid alarm 03-15  | Eid days  5/10 | before Eid [] | after Eid 5 day(s)
label gap B > 0.15      first Eid alarm 03-13  | Eid days  7/10 | before Eid [] | after Eid 4 day(s)

তিনটি শিক্ষা। এক, zone PSI সবার আগে, দশ দিনের দশ দিনই, কোনো মিথ্যা alarm ছাড়া — কিন্তু এটি কারণ দেখায়, ক্ষতি নয়। দুই, গড় অনুমান আর flagged অংশ ঈদের অর্ধেকেরও কম দিনে বাজল, আর ৬ মার্চের সাধারণ শুক্রবারেও; model ঈদ বোঝে না বলে তার অনুমান যথেষ্ট নড়ে না। তিন, label-এর ফাঁক মিথ্যা alarm দেয়নি, কিন্তু নিয়ম A-তে পাঁচ দিন দেরিতে; deadline-নিয়ম দুই দিন বাঁচাল। FOR_DAYS = 2-এ গড় আর flagged ঈদে একবারও বাজে না, PSI ১১ মার্চে, ফাঁক A ১৬ মার্চে: for: মিথ্যা alarm কমায়, দাম দেয় দেরিতে। Prometheus-এ এই নিয়ম পর্ব ৭৬-এ।

দৈনিক PSI-র গোলমাল। একই টেবিলে order hour-এর দৈনিক PSI-ও আছে ল্যাবে, কিন্তু নিয়মে রাখা হয়নি: ৭ মার্চের মতো সাধারণ দিনে তা ০.৬০৩৬! দিনে মাত্র ৫০–৭০টি অর্ডারকে দশটি quantile bin-এ ভাগ করলে অনেক bin প্রায় খালি থাকে, আর PSI ফুলে ওঠে (পর্ব ৭২-এর “১০০-এর কম অনুমানে PSI অর্থহীন”)। Zone-এর মাত্র তিনটি bin, তাই সে টিকে যায়। নমুনার আকার আর bin-এর সংখ্যার এই টানাপোড়েন পর্ব ৭৪-এর বিষয়।

৫ · Label ছাড়া মান অনুমান — কতটুকু পারে, কোথায় অন্ধ

Label-এর জন্য পাঁচ দিন অপেক্ষা না করে আজই মান আন্দাজ করা যায়? Model calibrated হলে ০.৩ বলা অর্ডারের প্রায় ৩০% সত্যিই দেরি হবে। তাহলে আজকের অনুমান থেকেই প্রত্যাশিত দেরির হার (p-এর গড়), প্রত্যাশিত precision (flagged অর্ডারের p-এর গড়) আর recall হিসাব করা যায়, label ছাড়া। একে বলে performance estimation; AUC-এর মতো metric-এর জন্য পরিচিত রূপ CBPE (confidence-based performance estimation), open-source লাইব্রেরি NannyML-এ।

ল্যাবে দুইভাবে চালানো হলো: নিজের লেখা সরল হিসাব (est.py), আর নিজের uv venv-এ NannyML 0.13.1 (Apache-2.0, package metadata থেকে যাচাই)। NannyML-এর CBPE reference হিসেবে valid জানালা (label-সহ) নেয়, সেখানে model-এর score-কে একবার calibrate করে, তারপর নতুন জানালায় label ছাড়া অনুমান করে। সত্যিকারের ফল, প্রত্যাশিত বনাম আসল:

জানালাদেরির হার: অনুমান / আসলAUC: CBPE / আসলPrecision@০.৩৫: CBPE / আসলRecall@০.৩৫: CBPE / আসল
mar_normal০.২৩৮৪ / ০.২৩০৪০.৭৫২৭ / ০.৭৫২২০.৫৪৪৭ / ০.৪৭৫০০.৪৪৬৭ / ০.৪৪১৯
eid_rush০.৩০১৯ / ০.৫৮৮১০.৭৪৭০ / ০.৭৪৫১০.৫৫৩৮ / ০.৭৯৭৭০.৫৭৯৫ / ০.৪৬৭০
after_eid০.২৪৭৮ / ০.২৭৯২০.৭৫২৪ / ০.৭৫৩২০.৫২৬৮ / ০.৫৬০০০.৪৮৩৯ / ০.৫০০০

সাধারণ সময়ে AUC আর recall-এর অনুমান খুব কাছে; precision-এ ০.০৭-এর ফাঁক, যার কিছুটা নমুনার গোলমাল (৫৬০টির মাত্র ১২০টি flagged). ঈদে AUC-ও ঠিক (০.৭৪৭০ বনাম ০.৭৪৫১), কিন্তু সেটি ভাগ্য — ঈদে ক্রম সত্যিই টিকে ছিল। বাকিগুলো বড় ভুল: CBPE বলল precision প্রায় আগের মতো (০.৫৫৩৮), আসলে লাফিয়ে ০.৭৯৭৭; recall বাড়িয়ে বলল (০.৫৭৯৫ বনাম ০.৪৬৭০); আর দেরির হারকে প্রায় অর্ধেক বলল। NannyML-এর দৈনিক চালানোতেও (ঢাকার দিন ধরে chunk, ১৪টি valid দিন থেকে সীমা) মার্চের একটি দিনেও alert হয়নি; দৈনিক ৬০–১০০ অর্ডারে তার সীমা এত চওড়া (AUC ০.৪৮৪৭ থেকে ০.৯৯৫৮) যে কিছুই ধরা পড়ে না।

কারণটি গঠনে, কোডে নয়। এই পদ্ধতির শর্ত: P(দেরি | feature) বদলায়নি, শুধু input-এর মিশ্রণ বদলেছে — অর্থাৎ শুধু covariate shift, concept drift নয়। ঈদে ঠিক এই শর্ত ভেঙেছে: একই zone, courier আর ঘণ্টার অর্ডার অনেক বেশি দেরি করছে। নিজের সম্ভাবনায় ভরসা করা পদ্ধতি নিজের calibration ভাঙা দেখতে পারে না। নিচের reliability টেবিল (ল্যাবের আসল সারি):

reliability mar_normal                 reliability eid_rush
bin          n  mean_p  late_rate      bin          n  mean_p  late_rate
[0.0, 0.1) 120  0.0684  0.0667         [0.0, 0.1) 141  0.0687  0.2128
[0.1, 0.2) 178  0.1480  0.1180         [0.1, 0.2) 212  0.1514  0.4623
[0.2, 0.3) 103  0.2483  0.2816         [0.2, 0.3) 211  0.2484  0.5640
[0.3, 0.4)  68  0.3465  0.3235         [0.3, 0.4) 150  0.3449  0.7133
[0.4, 0.5)  40  0.4495  0.4250         [0.4, 0.5) 125  0.4441  0.7360
[0.5, 0.6)  26  0.5494  0.5385         [0.5, 0.6)  90  0.5507  0.8556
[0.6, 1.0)  25  0.7017  0.7200         [0.6, 1.0)  76  0.6891  0.8947

সাধারণ মার্চে প্রতিটি ঝুড়িতে অনুমান আর বাস্তব কাছাকাছি। ঈদে প্রতিটি ঝুড়িতে বাস্তব অনেক বেশি, কিন্তু ক্রম একই: এটাই “AUC টিকে আছে, calibration ভেঙেছে”-র ছবি। Calibration-এর তত্ত্ব Machine Learning কোর্সের পর্ব ২৬-এ; সারানোর পথ পর্ব ৭৫-এ।

ব্রাউজারে একই হিসাব, ল্যাবের দুই জানালার সব অনুমান ০.০৫ চওড়া ঝুড়িতে ভাগ করে (প্রতিটি সারি: জানালা, ঝুড়ির গড় p, অর্ডার, আসলে দেরি; ৩৪টি সারি, ল্যাবের bins.csv). ঝুড়ির সীমা ০.৩৫-এ পড়ে, তাই flagged আর বাকিরা হুবহু আলাদা হয়:

# Label-free estimates vs the truth, from the lab's real predictions binned by probability (0.05 wide).
# Each row: window, mean predicted probability in the bin, orders in the bin, how many were really late.
import csv
rows = list(csv.DictReader(open("prob_bins.csv")))
T = 0.35                                   # the bins are aligned so p >= 0.35 means "flagged"

for w in ("mar_normal", "eid_rush"):
    b = [(float(r["p_mean"]), int(r["n"]), int(r["late"])) for r in rows if r["window"] == w]
    n = sum(k for _, k, _ in b)
    sum_p = sum(p * k for p, k, _ in b)                  # expected number of late orders
    late = sum(l for _, _, l in b)
    flag = [(p, k, l) for p, k, l in b if p >= T]
    nf, pf, lf = sum(k for _, k, _ in flag), sum(p * k for p, k, _ in flag), sum(l for *_, l in flag)
    print(f"{w}: {n} orders")
    print(f"  late rate   estimated {sum_p / n:.4f}  actual {late / n:.4f}")
    print(f"  precision   estimated {pf / nf:.4f}  actual {lf / nf:.4f}")
    print(f"  recall      estimated {pf / sum_p:.4f}  actual {lf / late:.4f}")
    worst = max(b, key=lambda x: x[1] * abs(x[2] / x[1] - x[0]))
    print(f"  biggest bin gap: predicted {worst[0]:.2f}, really late {worst[2] / worst[1]:.2f} ({worst[1]} orders)")

আসল আউটপুট (ব্রাউজারের Python):

mar_normal: 560 orders
  late rate   estimated 0.2384  actual 0.2304
  precision   estimated 0.5060  actual 0.4750
  recall      estimated 0.4549  actual 0.4419
  biggest bin gap: predicted 0.17, really late 0.12 (85 orders)
eid_rush: 1005 orders
  late rate   estimated 0.3019  actual 0.5881
  precision   estimated 0.5150  actual 0.7977
  recall      estimated 0.5874  actual 0.4670
  biggest bin gap: predicted 0.28, really late 0.66 (100 orders)

প্রথম তিন লাইনের প্রতিটি সংখ্যা ল্যাবের est.py-এর সারি-ধরে হিসাবের সঙ্গে হুবহু, কারণ ঝুড়ির গড় p × অর্ডার = সেই অর্ডারগুলোর p-এর যোগফল। ঈদে সবচেয়ে বড় ফাঁকের ঝুড়ি: model বলেছে ০.২৮, আসলে ০.৬৬, ১০০টি অর্ডারে। এই পদ্ধতির ঠিক জায়গা তাই ছোট: input-এর মিশ্রণ বদলেছে কিন্তু নিয়ম একই — যেমন নতুন জেলায় বিক্রি শুরু — তখন সে label-এর আগেই বলতে পারে precision কোন দিকে যাচ্ছে। নিয়ম বদলালে সে নিশ্চিন্তে ভুল বলে।

ল্যাবে NannyML চালাতে যা লাগল: NannyML 0.13.1 Python < 3.13 চায় (metadata-র Requires-Python), তাই Python 3.12-এর venv; ইনস্টলের পরে import-এ ModuleNotFoundError: No module named 'statsmodels' — তার dependency তালিকায় statsmodels নেই, অথচ plot-এর কোড তা চায়; আলাদা করে statsmodels 0.15.0 দিতে হলো। লাইব্রেরিটি ডিফল্টে usage তথ্য পাঠায় (সোর্সের usage_logging.py); NML_DISABLE_USAGE_LOGGING=1 দিয়ে বন্ধ রাখা হয়েছে। venv-এর আকার ১.৮ GB, কাজ শেষে মুছে ফেলা হয়েছে।

৬ · Segment ধরে দেখুন — গড় লুকিয়ে রাখে

পুরো জানালার একটি সংখ্যা অনেক কিছু লুকাতে পারে। একই ঈদের ডেটা zone ধরে ভাগ করলে (ল্যাবের সত্যিকারের run, threshold ০.৩৫):

Zone · জানালাঅর্ডারআসল দেরিগড় অনুমানflaggedprecisionrecallAUC
১ · mar_normal১৬৮০.১০১২০.১২৭৫০.০২৯৮০.৪০০০০.১১৭৬০.৬১৯২
১ · eid_rush১৯৪০.৩২৪৭০.১২৭৭০.০২০৬০.২৫০০০.০১৫৯০.৬৭০৪
২ · mar_normal২৬৪০.২১২১০.২১৪৫০.১৪৩৯০.৪২১১০.২৮৫৭০.৭০৪৮
২ · eid_rush৩৬৮০.৫১৯০০.২৩৯২০.১৬৫৮০.৭৭০৫০.২৪৬১০.৬৮১১
৩ · mar_normal১২৮০.৪৩৭৫০.৪৩৩০০.৬০১৬০.৫০৬৫০.৬৯৬৪০.৬৭৯৩
৩ · eid_rush৪৪৩০.৭৬০৭০.৪৩০২০.৬৩৪৩০.৮১১৪০.৬৭৬৬০.৬৪৪৪

তিনটি জিনিস চোখে পড়ে, যা পুরো জানালার সংখ্যায় ছিল না। এক, ঢাকা শহরের (zone ১) দেরি তিন গুণের বেশি বেড়েছে, ০.১০১২ থেকে ০.৩২৪৭ — আনুপাতিকভাবে সবচেয়ে বড় লাফ। অথচ model সেখানে গড়ে ০.১২৭৭ বলছে, আগের মতোই, আর ১৯৪টির মাত্র ৪টি অর্ডার flag করেছে; ৬৩টি দেরির মধ্যে ধরেছে ১টি, recall ০.০১৫৯। ঢাকার dispatcher-এর কাছে model কার্যত বন্ধ। দুই, প্রতিটি zone-এর ভেতরের AUC (০.৬৪–০.৬৮) পুরো জানালার AUC-এর (০.৭৪৫১) চেয়ে কম। পুরো AUC-এর একটি বড় অংশ আসে zone-এর মধ্যের ক্রম থেকে: zone ৩-কে ওপরে রাখা, আর ঈদে zone ৩-এর অংশ ২৩% থেকে ৪৪%-এ উঠেছে। তিন, courier ধরেও একই ছবি: ঈদে drut-এর দেরি ০.৫১৩৫ অথচ গড় অনুমান ০.২১৭৩, recall ০.২৭৪৪; nodi-তে recall ০.৭০৩২।

এই নজরদারির নাম segment monitoring. তিনটি নিয়ম: segment কম আর অর্থবহ (zone, courier, payment — customer_id নয়); ন্যূনতম নমুনা (দিনে zone ১-এর ২০টি অর্ডারে recall অর্থহীন, সপ্তাহে দেখুন); আর প্রতিটি segment-কে তার নিজের অতীতের সঙ্গে তুলনা (zone ৩-এর ০.৪৩ গড় অনুমান স্বাভাবিক, zone ১-এর জন্য বিপদের)। Prometheus-এ segment label-এর cardinality পর্ব ৭৬-এ; কোনো এলাকা নিয়মিত কম বা বেশি flagged হলে তা ন্যায্যতার প্রশ্ন, পর্ব ৭৭-এ।

৭ · কী alert, কী শুধু dashboard, আর মালিক কে

সব সংকেতে alert দিলে on-call মানুষ ক্লান্ত হয়ে সব উপেক্ষা করবেন। নীতি: alert দিন যখন কাউকে এখনই কিছু করতে হবে আর সংকেতটি নির্ভরযোগ্য; বাকিটা dashboard-এ। বাজারঘরের জন্য:

সংকেতধরনমালিককেন
Error rate, p95 latency (SLO)Page (জরুরি alert)Platform / on-callক্রেতা এখনই আটকে আছেন; পর্ব ৬৬ (Cloud & DevOps)
fct_deliveries-এর freshness আর volumeAlertData engineerLabel না এলে নিচের সব মাপ নীরবে খালি হয়; পর্ব ৫১
Feature-এর অচেনা মান, null, ওজনের এককAlertML engineerনিশ্চিত bug (পর্ব ৬০-এর gram); data validation পর্ব ৫০
কম bin-এর feature-এর PSI (zone)Ticket (দিনের মধ্যে দেখা)ML engineerদ্রুত আর এখানে মিথ্যা alarm নেই, কিন্তু ক্ষতির প্রমাণ নয়
গড় অনুমান, flagged অংশDashboard + for:-সহ বড় লাফে alertML engineerশুক্রবারের মতো স্বাভাবিক ওঠানামা আছে
Label-এর ফাঁক, Brier (পূর্ণতার হারসহ)Ticket, ধারাবাহিক হলে জরুরিML engineer + data scientistসবচেয়ে নির্ভরযোগ্য, কিন্তু দেরিতে
Zone আর courier ধরে মানসাপ্তাহিক dashboardML + dispatch-এর দলনমুনা ছোট; সিদ্ধান্ত ব্যবসার
অভিযোগ, dispatcher-এর overrideDashboardProduct / operationsশেষ বিচার, কিন্তু ধীর আর বহু কারণে নড়ে

দ্বিতীয় সারিটি সহজে ভুলে যাওয়া হয়: label-এর pipeline নিজেই একটি data pipeline. deliveries-এ নতুন সারি না এলে label-এর হিসাব নীরবে খালি বা পুরোনো থাকবে — সবুজ রঙে। তাই দিনে কতগুলো label এল (মার্চে ৪৪ থেকে ১২৪টি), সেটিও একটি data observability-র metric.

Online বনাম batch model-এর নজরদারি

পর্ব ৬৭-এর online API আর পর্ব ৬৮-এর রাতের batch-এর নজরদারি ওপরের দুই স্তরে আলাদা, নিচের দুই স্তরে এক। Online-এ প্রতিটি অনুরোধের latency আর error দেখা হয়, metric যায় Prometheus-এ। Batch-এ তার বদলে job সফল কি না, সারি মেলে কি না, আর একটি run-এ একটিই model_version (পর্ব ৬৮-এর check); ফলের টেবিলই তার prediction log. কিন্তু label জোড়া, censoring bias, segment আর calibration দুই ক্ষেত্রেই হুবহু এক।

মডিউলের বাকি পর্ব: ৭৪-এ data drift (PSI, KS test, Evidently); ৭৫-এ concept drift আর retraining; ৭৬-এ এই নিয়মগুলো Prometheus আর Grafana-য়; ৭৭-এ ঈদের ঘটনা একটি incident হিসেবে, model card-সহ।

আরও গভীরে: দেরিতে আসা, আংশিক দেখা ফলের সমস্যা পরিসংখ্যানে পুরোনো: চিকিৎসায় রোগী কতদিন বাঁচবেন, তার হিসাবে কিছু রোগী গবেষণা শেষ হওয়া পর্যন্ত বেঁচে থাকেন (censored), আর তাঁদের বাদ দিলে গড় আয়ু কম দেখায়। Kaplan ও Meier-এর ১৯৫৮ সালের পদ্ধতি এমন ডেটা থেকে সঠিক হার বের করার মানদণ্ড, আর “পার্সেল কত ঘণ্টায় পৌঁছায়” ঠিক সেই ধরনের প্রশ্ন। Production ML-এর নজরদারির তালিকা হিসেবে Google-এর Breck ও সহকর্মীদের “The ML Test Score” (IEEE Big Data, ২০১৭) প্রবন্ধে একটি আলাদা monitoring অংশ আছে; আর Sculley ও সহকর্মীদের ২০১৫ সালের hidden technical debt প্রবন্ধ (পর্ব ৫৪) বলে, ML system-এর সীমানা ঝাপসা বলে নজরদারিই অনেক সময় একমাত্র প্রতিরক্ষা।

পরীক্ষা ও ইন্টারভিউতে:

  • ML monitoring-এর স্তরগুলো কী কী? Service, ইনপুট ডেটা, অনুমান, label-সহ model-এর মান, আর ব্যবসার ফল; ওপরেরগুলো দ্রুত কিন্তু পরোক্ষ।
  • Label delay থাকলে মান কীভাবে মাপবেন? Label-কে তার আসার সময়ে জুড়ুন, পূর্ণ cohort-এ মাপুন, পাশে পূর্ণতার হার লিখুন, আর সম্ভব হলে deadline-নিয়মে আগে নিশ্চিত হোন।
  • Censoring bias কী? আগে আসা label একটি বিশেষ দল (এখানে দ্রুত, সময়মতো পার্সেল), তাই অসম্পূর্ণ সময়ের মাপ একদিকে হেলে।
  • Label ছাড়া মান অনুমান কখন চলে? যখন শুধু input-এর মিশ্রণ বদলায় আর model calibrated থাকে; concept drift-এ চলে না।
  • AUC স্থির থাকলে কি model ঠিক আছে? না; ক্রম ঠিক থেকেও calibration ভাঙতে পারে, যা Brier, log loss আর threshold-এর সিদ্ধান্ত নষ্ট করে।

৮ · AI-এর যুগে monitoring-এর কোড যাচাই

“আমার model-এর জন্য একটি monitoring job লিখে দাও” — AI সহকারী দ্রুত সুন্দর কোড আর dashboard দেয়। ভুলগুলো সাধারণত সময় আর label নিয়ে, আর সেগুলো error দেয় না:

AI প্রায়ই যা লেখেকী ভাঙেকীভাবে ধরবেন
অর্ডারের তারিখে join, “এখন পর্যন্ত যা label আছে” দিয়ে আজকের precisionCensoring bias: প্রথম দিনগুলোতে দেরির হার ০প্রতিটি সংখ্যার পাশে পূর্ণতার হার; অতীতের একটি দিনে replay করুন
date(order_ts) দিয়ে দিনUTC-র তারিখ, ঢাকার নয়; রাতের অর্ডার আগের দিনেAsia/Dhaka-য় রূপান্তর আর একটি রাতের অর্ডার হাতে মেলান
Alert শুধু AUC-এঈদের মতো calibration ভাঙা চোখে পড়ে নাBrier বা অনুমান বনাম আসল হারও রাখুন
দৈনিক ৫০টি সারিতে ১০ bin-এর PSIসাধারণ দিনে ০.৬০ — মিথ্যা alarmনমুনা আর bin গুনুন; শান্ত সময়ে নিয়ম চালিয়ে দেখুন
Label ছাড়া অনুমানকে (CBPE) সত্য হিসেবে dashboard-এConcept drift-এ নিশ্চিন্তে ভুল“অনুমান” লেখা, আর label এলে মিলিয়ে দেখা
Prometheus label-এ order_id বা customer_idপ্রতিটি অর্ডারে নতুন time seriesLabel-এর মান গুনুন; প্রতি অর্ডারের তথ্য log-এ

AI-কে কাজ দিলে সময় আর label-এর নিয়ম স্পষ্ট করে দিন:

তুমি একজন অভিজ্ঞ MLOps engineer. একটি late-delivery classifier-এর দৈনিক monitoring job লিখে দাও (Python, pandas বা DuckDB). ১. ইনপুট: prediction log (ts UTC, request_id, model_version, feature, p) আর deliveries (order_id, delivered_ts UTC, is_late, promised_days). ২. দিন মানে ঢাকার দিন (UTC+6); প্রতিটি দিনের শেষে শুধু সেই মুহূর্তে জানা label ব্যবহার করবে, আগে নয়। ৩. দুই নিয়মে label-এর সময়: পৌঁছানোর মুহূর্ত, আর প্রতিশ্রুত দিনের মধ্যরাত পেরোলে দেরি নিশ্চিত। ৪. প্রতিদিন: গড় অনুমান, flagged অংশ (০.৩৫), zone-এর PSI, সেদিন আসা label-এর আসল হার বিয়োগ অনুমান, আর প্রতিটি অর্ডার-দিনের label পূর্ণতার হার। ৫. প্রতিটি সংখ্যার নমুনা-সংখ্যা ছাপাবে; ১০০-র কম হলে সতর্ক করবে। ৬. যে লাইব্রেরির API সম্পর্কে নিশ্চিত নও, version-সহ আলাদা করে বলো।

AI-এর লেখা monitoring job হাতে পেলে — যাচাইয়ের চেকলিস্ট

ভাবনার প্রশ্ন

প্রতিটি প্রশ্ন নিয়ে নিজে কিছুক্ষণ ভাবুন, তারপর “→ উত্তর” চাপুন।

প্র ০১ঈদে AUC প্রায় একই (০.৭৪৫১), অথচ Brier প্রায় দ্বিগুণ। Monitoring-এর প্রধান metric কোনটি হবে — AUC, Brier, না অন্য কিছু?

দুটি metric দুটি আলাদা প্রশ্নের উত্তর দেয়। AUC বলে model ঝুঁকির ক্রম ঠিক রাখে কি না: একটি দেরির আর একটি সময়মতো অর্ডার এলোমেলো নিলে দেরিরটিকে বেশি score দেওয়ার সম্ভাবনা। এটি সব score-কে একসঙ্গে দ্বিগুণ বা অর্ধেক করলেও বদলায় না। Brier score বলে সম্ভাবনার মান কতটা সত্য: প্রতিটি অনুমান আর আসল ০ বা ১-এর ফাঁকের বর্গের গড়। এর ইতিহাস আবহাওয়ার পূর্বাভাসে: Glenn W. Brier ১৯৫০ সালে Monthly Weather Review-এ সম্ভাবনা-ভিত্তিক পূর্বাভাস যাচাইয়ের এই মাপ প্রস্তাব করেন — যেখানে “৭০% বৃষ্টি” বলার মানে সত্যিই ১০০ দিনে ৭০ দিন বৃষ্টি হওয়া।

কোনটি প্রধান, তা নির্ভর করে model-এর ব্যবহারে। বাজারঘরে model-এর ফল একটি threshold (০.৩৫) দিয়ে সিদ্ধান্তে বদলায়: কোন অর্ডার dispatcher-এর তালিকায় উঠবে। Threshold-টি valid ডেটায় বাছা হয়েছিল ধরে নিয়ে যে ০.৩৫ মানে মোটামুটি ৩৫% ঝুঁকি। Calibration ভাঙলে ক্রম ঠিক থাকলেও threshold-এর অর্থ বদলে যায়: ঈদে zone ১-এর ৬৩টি দেরির মধ্যে মাত্র একটি তালিকায় উঠল। তাছাড়া দোকান যদি অনুমানের যোগফল দিয়ে কাল কতগুলো দেরি হবে তা অনুমান করে (courier-এর বাড়তি লোক, ক্রেতাকে আগাম বার্তা), তাহলে calibration-ই সব।

আবার শুধু Brier-ও যথেষ্ট নয়: সে ক্রম আর calibration-কে একটি সংখ্যায় মেশায়, আর দেরির মূল হার বদলালে নিজে থেকেই বদলায় (ঈদে ভিত্তি হার ০.৫৮৮১, তাই নিখুঁত calibrated model-এর Brier-ও বাড়ত)। তাই ভালো dashboard দুটি আলাদা রাখে: ক্রমের জন্য AUC, আর calibration-এর জন্য সরল একটি সংখ্যা — “গড় অনুমান বনাম আসল হার” বা reliability টেবিল, এই পর্বের label-এর ফাঁক। সঙ্গে সিদ্ধান্তের metric: threshold-এ precision আর recall, segment ধরে।

মূল উপলব্ধি: AUC ক্রম মাপে, calibration মাপে সম্ভাবনার সততা; threshold-এ সিদ্ধান্ত নেওয়া model-এ দুটিই আলাদা করে দেখুন, আর alert দিন অল্প নমুনায় স্থির সংখ্যায়।

প্র ০২Censoring bias শুধু monitoring-এর সমস্যা নয়। Retraining, A/B test আর ব্যবসার রিপোর্টে একই ফাঁদ কোথায় লুকায়, আর survival analysis কী শেখায়?

যেখানেই “এখন পর্যন্ত জানা ফল” দিয়ে হার হিসাব হয়, সেখানেই এই ফাঁদ। Retraining-এ: গত কয়েক দিনের অর্ডারসহ আবার শেখালে তাদের জানা label প্রায় সব সময়মতো, তাই model শেখে “সাম্প্রতিক অর্ডারে দেরি কম” — এজন্যই পর্ব ৬৩-এর DAG ডেটার শেষে ৭ দিনের ফাঁক রাখে। A/B test-এ: পর্ব ৭২-এর অপরিণত label. রিপোর্টে: “এই সপ্তাহের দেরির হার” সপ্তাহ শেষের দিনেই ছাপালে সবসময় ভালো দেখায়।

পরিসংখ্যানে এর পুরোনো নাম survival analysis. চিকিৎসা-গবেষণায় রোগীরা আলাদা দিনে যোগ দেন, গবেষণা শেষ হয় একদিনে; শেষ দিনে অনেকে বেঁচে আছেন, তাঁদের “কতদিন বাঁচলেন” এখনো অজানা (right-censored). তাঁদের বাদ দিলে গড় আয়ু কম দেখায়, ঠিক যেমন অজানা পার্সেল বাদ দিলে দেরির হার কম দেখায়। Edward Kaplan আর Paul Meier ১৯৫৮ সালে Journal of the American Statistical Association-এ যে product-limit পদ্ধতি দেন, তা প্রতিটি সময়ে “তখনো ঝুঁকিতে থাকা” দলের তথ্য ব্যবহার করে censored ডেটা থেকে পক্ষপাতহীন হার বের করে।

বাজারঘরে এর সরল রূপ: পার্সেল পৌঁছাতে কত ঘণ্টা লাগে, তার বণ্টন অতীত থেকে জানা। আজ একটি অর্ডার ৫০ ঘণ্টা ধরে পথে থাকলে সে আর “অজানা” নয়, সে “অন্তত ৫০ ঘণ্টা” — এবং এমন অর্ডারের দেরির সম্ভাবনা গড়ের চেয়ে অনেক বেশি। এই তথ্য ফেলে না দিয়ে কাজে লাগানোই survival-এর মূল কথা। Deadline-নিয়ম (নিয়ম B) এর সবচেয়ে সহজ, নিখুঁত রূপ, কারণ এখানে সংজ্ঞাই বলে দেয় কখন দেরি নিশ্চিত।

আর একটি সূক্ষ্মতা: বাতিল অর্ডারের কোনো delivery নেই, তাই কোনো label-ও নেই। ক্রেতা যদি দেরির ভয়ে বাতিল করেন, সেই ঝুঁকিপূর্ণ অর্ডারগুলো মূল্যায়ন থেকে চিরকাল বাদ — আরেক ধরনের নির্বাচনের পক্ষপাত।

মূল উপলব্ধি: অসম্পূর্ণ সময়ের যে কোনো হার censored; পূর্ণ cohort, deadline-নিয়ম বা survival-এর পদ্ধতি দিয়ে সামলান, আর retraining-এর ডেটার শেষেও label-এর ফাঁক রাখুন।

প্র ০৩Label ছাড়া মান অনুমান (CBPE) ঈদে ব্যর্থ হলো। তাহলে কি এই ধরনের পদ্ধতি অর্থহীন? কখন এটি সত্যিই কাজে লাগে, আর কখন বিপজ্জনক?

অর্থহীন নয়, কিন্তু তার একটি স্পষ্ট শর্ত আছে, আর সেটি না জেনে ব্যবহার করা বিপজ্জনক। CBPE প্রতিটি সম্ভাবনাকে একটি ছোট “প্রত্যাশিত label” ধরে confusion matrix-এর প্রত্যাশিত ঘর যোগ করে, reference ডেটায় একবার calibrate করে নিয়ে।

শর্তটি: নতুন সময়ে P(দেরি | feature) বদলায়নি। তখন input-এর মিশ্রণ বদলালে — ধরুন বাজারঘর হঠাৎ zone ৩-এ বিজ্ঞাপন দিল, দূরের অর্ডার দ্বিগুণ হলো, কিন্তু প্রতিটি zone-এর আচরণ আগের মতো — CBPE সঠিকভাবে বলবে precision কোন দিকে যাচ্ছে, label আসার পাঁচ দিন আগে। এটি সত্যিকারের লাভ, বিশেষ করে যেখানে label আসে মাসে (ঋণ খেলাপি) বা কখনোই আসে না পুরোপুরি।

বিপদ হলো concept drift-এ। ঈদে একই feature-এর অর্ডার বেশি দেরি করেছে, কারণ courier-এর ভিড় model-এর কোনো feature-এ নেই। Model নিজের ভুল জানে না, তাই তার সম্ভাবনা দিয়ে বানানো অনুমানও জানে না। ল্যাবের ফল ঠিক এটাই: CBPE-এর precision ০.৫৫৩৮, আসল ০.৭৯৭৭; দৈনিক চালানোয় একটিও alert নয়। খারাপ দিক হলো, ব্যর্থতাটি নীরব: dashboard-এ আনুমানিক precision স্থির, সবুজ। যে দল label-ভিত্তিক মাপ বাদ দিয়ে শুধু এর ওপর ভরসা করবে, সে ঠিক সেই ঘটনাগুলো মিস করবে যেগুলোর জন্য monitoring বানানো।

তাই সৎ ব্যবহার তিনটি নিয়মে। এক, dashboard-এ “আনুমানিক” শব্দটি লিখুন আর label এলে একই চার্টে আসল মান বসান — দুটি রেখা আলাদা হতে শুরু করাই concept drift-এর সংকেত। দুই, input drift-এর সংকেতের সঙ্গে মিলিয়ে পড়ুন: PSI বাজছে অথচ আনুমানিক মান স্থির, এমন অবস্থায় বেশি সন্দেহ করুন। তিন, ঈদের মতো জানা মৌসুমে আলাদা সতর্কতা।

মূল উপলব্ধি: Label ছাড়া অনুমান শুধু covariate shift-এ সৎ; concept drift-এ সে নিশ্চিন্তে ভুল বলে, তাই তাকে কখনো label-এর বদলি নয়, অপেক্ষার সময়ের সহায়ক হিসেবে রাখুন।

প্র ০৪ঈদে zone PSI প্রথম দিনেই বেজেছে। তাহলে কি label-এর অপেক্ষা না করে PSI বাজলেই model ফিরিয়ে নেওয়া বা আবার শেখানো উচিত?

না, আর কারণটি এই পর্বের ডেটাতেই আছে। PSI বলে input-এর বণ্টন বদলেছে, model-এর ক্ষতি হয়েছে এমন নয়। ঈদের পরের জানালায় (after_eid) ঘণ্টার PSI ০.০২৬৬, model ভালো; আবার এমন বদলও হতে পারে যেখানে PSI বিশাল কিন্তু model-এর মান অপরিবর্তিত — যেমন zone ৩-এর অর্ডার দ্বিগুণ হলো কিন্তু প্রতিটি zone-এর আচরণ একই। তখন model ঠিকই আছে; শুধু বেশি অর্ডার flag হবে, যা ঠিক।

দ্বিতীয়ত, “ফিরিয়ে নেওয়া” কোথায়? Rollback তখনই কাজে লাগে যখন আগের model ভালো ছিল। ঈদে v1-ই একমাত্র model, আর আগের যে কোনো model-ও ঈদ দেখেনি। তৃতীয়ত, আবার শেখানোর জন্য ঈদের label লাগে — যা আসতে পাঁচ দিন। PSI বাজার দিনে retraining মানে পুরোনো ডেটায় একই model আবার বানানো।

PSI তাহলে কী কাজে লাগে? এটি একটি সতর্কসংকেত, সিদ্ধান্ত নয়। ১০ মার্চ রাতে zone PSI বাজলে সঠিক প্রতিক্রিয়া মানুষের: dispatch-এর দলকে জানানো যে model-এর অনুমান এই কয়েক দিন কম নির্ভরযোগ্য হতে পারে, zone আর courier ধরে label পূর্ণতার হার বেশি নজরে রাখা, deadline-নিয়মে আগাম label দেখা, আর আগে থেকে লেখা একটি পরিকল্পনা চালু করা — যেমন ঈদে threshold সাময়িক কমানো বা একটি সরল নিয়ম (zone ৩ আর রাতের অর্ডার) পাশাপাশি চালানো। এগুলো পর্ব ৭৫ আর ৭৭-এর বিষয়।

আর ঈদ আগে থেকে জানা; ভালো দল এমন মৌসুম ক্যালেন্ডারে চিহ্নিত রাখে, আলাদা সীমা আর পরিকল্পনাসহ। Google-এর SRE বইয়ের (২০১৬) পরামর্শও খাটে: alert হোক উপসর্গে, কারণে নয়।

মূল উপলব্ধি: Input drift সন্দেহ জাগায়, প্রমাণ নয়; তার উত্তর মানুষের সতর্কতা আর আগে লেখা পরিকল্পনা, স্বয়ংক্রিয় rollback বা retraining নয়।

প্র ০৫Label পাঁচ দিন দেরিতে আসে। আরও দ্রুত ground truth পাওয়ার কোন কোন উপায় আছে, আর প্রতিটির দাম কী?

প্রথম উপায় এই পর্বেই দেখেছেন: সংজ্ঞা থেকে আগাম নিশ্চয়তা। “প্রতিশ্রুত দিন পেরোলেই দেরি” নিয়মে পূর্ণতার সময় ৭ থেকে ৪ দিনে নামল, ঈদের alarm দুই দিন আগে এল, আর কোনো ভুল ঢুকল না। দাম প্রায় নেই, কিন্তু এটি তখনই সম্ভব যখন ব্যবসার সংজ্ঞায় একটি স্থির সীমা থাকে। “ক্রেতা সন্তুষ্ট কি না”-র মতো label-এ এমন সীমা নেই।

দ্বিতীয় উপায় মধ্যবর্তী ঘটনা: courier পার্সেল কখন তুলল, কখন hub-এ পৌঁছাল, “out for delivery” কখন। এগুলো ঘণ্টায় আসে, আর দেরির শক্ত পূর্বাভাস দেয়। দাম: এগুলো label নয়, আরেকটি অনুমান; courier-এর API বদলালে নিজেই drift করে, আর একটি আলাদা data pipeline লাগে (পর্ব ৫১-এর নজরদারিসহ)।

তৃতীয় উপায় মানুষের যাচাই: প্রতিদিন এলোমেলোভাবে বাছা কিছু অর্ডারের অবস্থা courier-কে ফোন করে জানা। Machine Learning পর্ব ৬৯ এমন নমুনা-যাচাইয়ের কথা বলে। দাম: মানুষের সময়, আর নমুনা ছোট বলে শুধু বড় বদল ধরা যায়। কিন্তু এটি পক্ষপাতহীন, কারণ বাছাই এলোমেলো — censoring নেই।

চতুর্থ উপায় ক্রেতার সংকেত: “আমার পার্সেল কোথায়” প্রশ্ন বা অভিযোগ। দ্রুত, কিন্তু পক্ষপাতদুষ্ট: সবাই অভিযোগ করেন না, আর কোন এলাকার ক্রেতা বেশি করেন, তা নিজেই একটি বণ্টন। আর একটি সতর্কতা সব উপায়ের জন্য: model-এর রায় নিজেই যদি কাজ বদলায় (flagged অর্ডারে অগ্রাধিকার), তাহলে দ্রুত হোক বা ধীর, label আর স্বাভাবিক নয় — পর্ব ৭২-এর feedback loop আর holdout দল এখানেও লাগবে।

মূল উপলব্ধি: দ্রুত ground truth-এর প্রতিটি উৎসের নিজের পক্ষপাত আছে; সংজ্ঞা থেকে আসা নিশ্চয়তা আর এলোমেলো নমুনা-যাচাই সবচেয়ে সৎ, বাকিগুলো সন্দেহের সংকেত।

অনুশীলন

প্রথমটি নকশা, দ্বিতীয়টি ভুল খোঁজা, তৃতীয়টি হিসাব, চতুর্থটি আউটপুট অনুমান।

  1. নকশা করুন: পর্ব ৬৮-এর রাতের batch scoring প্রতিদিন একটি predictions টেবিলে (order_id, order_date_dhaka, p, model_version, run_id) লেখে। এর জন্য একটি monitoring-এর পরিকল্পনা লিখুন: কোন টেবিল, কোন task, প্রতিদিন কী গুনবেন, কোন সংখ্যায় alert আর কোনটি dashboard, আর কে মালিক।
    • DAG: scoring-এর পরে একটি monitor task; logical date = একটি ঢাকার দিন D (পর্ব ৩৭-এর data interval).
    • তিনটি টেবিল: mon_daily_pred (D-তে score হওয়া অর্ডারের সংখ্যা, গড় p, flagged অংশ, zone PSI, model_version একটিই কি না); mon_daily_labels (D-তে আসা label, নিয়ম A ও B: সংখ্যা, আসল হার, গড় p, ফাঁক, পূর্ণতার হার); mon_cohort (D − ৪ দিনের পূর্ণ cohort: AUC, Brier, precision, recall, zone আর courier ধরে)।
    • Alert: task ব্যর্থ বা সারি না মেলা (data engineer); ফাঁক > ০.১৫ পরপর দুই দিন (ML engineer, ticket); zone PSI > ০.১০ (ticket); দিনে ২০-এর কম label এলে label pipeline-এর alert.
    • Dashboard: গড় p, flagged অংশ, segment, পূর্ণতার হার, অভিযোগ; সাপ্তাহিক পর্যালোচনায় dispatch-এর দলসহ।
  2. ভুল খুঁজুন: একজন সহকর্মীর দৈনিক monitoring query (DuckDB). অন্তত চারটি ভুল বের করুন।
    -- run every night: today's model quality
    SELECT date(p.ts)                          AS day,
           avg(d.is_late)                      AS late_rate,
           avg(p.p)                            AS mean_pred,
           avg((p.p >= 0.35)::int * d.is_late) / avg(d.is_late) AS recall
    FROM predictions p
    JOIN deliveries d USING (order_id)
    WHERE date(p.ts) = current_date - 1
    GROUP BY 1;
    -- alert if recall < 0.40
    • UTC-র তারিখ: date(p.ts) UTC-র দিন; ঢাকার রাত ১২টা থেকে ভোর ৬টার অর্ডার আগের দিনে যায়। timezone('Asia/Dhaka', ts) লাগবে।
    • Censoring bias: গতকালের অর্ডারের মাত্র কিছু label এসেছে (ল্যাবে পরের দিন ২২–৪৫%), সবই সময়মতো; inner join বাকিগুলো চুপচাপ ফেলে দেয়। late_rate প্রায় ০ দেখাবে।
    • সময়ের কাট নেই: পরে আবার চালালে (backfill) তখন জানা সব label ঢোকে; একই দিনের সংখ্যা চালানোর দিনভেদে বদলায়। delivered_ts < cutoff চাই।
    • পূর্ণতার হার আর নমুনা নেই: কয়টি label-এ সংখ্যাটি বানানো, তা ছাপানো হয় না।
    • Alert-এর ভুল metric: এক দিনের অপরিণত recall-এ alert প্রতিদিন বাজবে; পূর্ণ cohort (৪ বা ৭ দিন আগের) বা ফাঁক ব্যবহার করুন, আর for: দিন।
  3. হিসাব করুন: ঈদের জানালায় zone ১-এ ১৯৪টি অর্ডার, তার ৬৩টি দেরি। Model ৪টি অর্ডার flag করেছে, যার ১টি সত্যি দেরি। Zone ১-এর গড় অনুমান ০.১২৭৭। (ক) precision আর recall কত? (খ) Model calibrated হলে কয়টি দেরি আশা করা যেত, আর আসলে কত গুণ? (গ) Zone ১-এর ফাঁক (আসল হার − গড় অনুমান) কত?

    (ক) Precision = ১ ÷ ৪ = ০.২৫; recall = ১ ÷ ৬৩ ≈ ০.০১৫৯। ল্যাবের সংখ্যা হুবহু।

    (খ) প্রত্যাশিত দেরি = ১৯৪ × ০.১২৭৭ ≈ ২৪.৮টি; আসল ৬৩, প্রায় ২.৫ গুণ।

    (গ) আসল হার ৬৩ ÷ ১৯৪ ≈ ০.৩২৪৭; ফাঁক ০.৩২৪৭ − ০.১২৭৭ = ০.১৯৭০, সীমা ০.১৫-এর ওপরে। পুরো জানালার recall (০.৪৬৭০) এই ধসটি লুকিয়ে রাখে।

  4. আউটপুট অনুমান করুন: অংশ ৪-এর alert_rules.py-তে FOR_DAYS = 2 করলে “mean prediction > 0.30” আর “label gap A > 0.15” নিয়মের লাইন দুটি কী ছাপাবে? আগে দৈনিক টেবিল দেখে নিজে অনুমান করুন, তারপর চালিয়ে মেলান।

    এই পর্বের সত্যিকারের run (একই ব্লক, FOR_DAYS = 2):

    mean prediction > 0.30  first Eid alarm never  | Eid days  0/10 | before Eid [] | after Eid 1 day(s)
    label gap A > 0.15      first Eid alarm 03-16  | Eid days  4/10 | before Eid [] | after Eid 5 day(s)

    গড় অনুমান ঈদে কখনো পরপর দুই দিন ০.৩০ পেরোয়নি (১১, ১৩, ১৯ মার্চ আলাদা আলাদা দিন), তাই ঈদে বাজেই না; বাজে শুধু ২০ মার্চে, কারণ ১৯ আর ২০ মার্চ পরপর (০.৩১০১, ০.৩১১৪) — ভিড় শেষ হওয়ার দিন! ৬ মার্চের মিথ্যা alarm-ও নেই। ফাঁক A ১৫ মার্চে প্রথম পার হয়, তাই দুই দিনের নিয়মে ১৬ মার্চে বাজে।

নিজেকে যাচাই করুন

ভুল হলে কারণসহ ব্যাখ্যা পাবেন, আবার চেষ্টাও করতে পারবেন।

ক্রমএকটি late-delivery অনুমানের নজরদারির ধাপগুলো ঠিক ক্রমে সাজান (▲▼ চেপে সরান)

  1. 🛒 Checkout-এ model score দেয়, prediction log-এ লাইন লেখা হয়
  2. 📊 দিনের শেষে label ছাড়া সংকেত গোনা হয়: গড় অনুমান, flagged অংশ, PSI
  3. ⏰ প্রতিশ্রুত দিন পেরোলে দেরি নিশ্চিত হয় (deadline-নিয়ম)
  4. 📦 পার্সেল পৌঁছায়, deliveries-এ label লেখা হয়
  5. 🔗 রাতের job label-কে আসার সময় ধরে জোড়ে আর ফাঁক হিসাব করে
  6. ✅ Cohort পূর্ণ হলে AUC, Brier আর segment-এর মান চূড়ান্ত হয়

একটি late-delivery model-এর API-তে error rate ০ আর p95 latency ৩ ms-এর নিচে, কিন্তু ঈদের ভিড়ে আসল দেরির হার ০.৫৯ আর model-এর গড় অনুমান ০.৩০। এই অবস্থাকে সবচেয়ে ভালো বর্ণনা করে কোনটি?

  • Service outage, তাই SLO-এর alert বাজা উচিত
  • Silent failure: service ঠিক, কিন্তু model-এর calibration ভেঙেছে
  • কিছুই হয়নি, এটি স্বাভাবিক ওঠানামা
  • Model খুব দ্রুত চলছে বলে ভুল করছে

পার্সেল পৌঁছালে তবেই একটি অর্ডারের label জানা যায়। অর্ডারের তিন দিন পরে “এখন পর্যন্ত জানা label” দিয়ে দেরির হার হিসাব করলে সাধারণত কী হয়?

  • হার আসলের চেয়ে বেশি দেখায়
  • হার পক্ষপাতহীন, শুধু নমুনা ছোট
  • হার আসলের চেয়ে কম দেখায় (censoring bias)
  • কোনো হার হিসাবই করা যায় না

Confidence-based performance estimation (CBPE) label ছাড়াই precision আর AUC আন্দাজ করে। কোন অবস্থায় এর অনুমান সবচেয়ে বেশি ভুল হবে?

  • Input থেকে ফলের নিয়মই বদলেছে (concept drift), যেমন একই ধরনের অর্ডার উৎসবে বেশি দেরি করছে
  • শুধু দূরের জেলার অর্ডারের অংশ বেড়েছে, প্রতিটি জেলার আচরণ একই
  • ডেটায় কোনো বদল নেই
  • Reference ডেটায় model ভালোভাবে calibrated ছিল

দিনে প্রায় ৬০টি অর্ডারে order hour-এর দৈনিক PSI, ১০টি quantile bin দিয়ে, একটি সাধারণ দিনে ০.৬০ এল। সবচেয়ে সম্ভাব্য ব্যাখ্যা কী?

  • ক্রেতাদের অর্ডারের সময় হঠাৎ পুরো বদলে গেছে
  • PSI-এর সূত্রে bug আছে
  • Model-এর calibration ভেঙেছে
  • অল্প নমুনায় অনেক bin, তাই নমুনার গোলমালেই PSI ফুলে উঠেছে

পুরো ঈদের জানালায় একটি model-এর recall ০.৪৭, কিন্তু ঢাকা শহরের অর্ডারে recall ০.০২। Monitoring-এর দিক থেকে এর শিক্ষা কী?

  • পুরো জানালার recall-ই যথেষ্ট, segment দেখার দরকার নেই
  • Segment ধরে নজরদারি লাগে, ন্যূনতম নমুনা আর segment-এর নিজের ভিত্তিসহ
  • প্রতিটি customer_id-কে আলাদা segment বানানো উচিত
  • Threshold ০.৩৫ থেকে ০.৯০ করলেই সমস্যা মিটবে

বাজারঘরে “দেরি” মানে প্রতিশ্রুত দিনের মধ্যরাত পেরিয়েও না পৌঁছানো। Monitoring-এ এই সংজ্ঞা কীভাবে কাজে লাগানো যায়?

  • সব অর্ডারের label deadline-এ জানা হয়, পৌঁছানোর অপেক্ষা লাগে না
  • Deadline-কে model-এর feature বানানো যায়
  • Deadline পেরোলেই দেরি নিশ্চিত ধরে label আগে পাওয়া যায়, তাই পূর্ণতার সময় কমে
  • দেরির হার কমে যায়, কারণ পথের পার্সেল গোনা হয় না

শব্দকোষ

লেখার মধ্যে ডটেড দাগ দেওয়া শব্দে মাউস রাখুন বা চাপুন, অর্থ দেখাবে। এই পর্বের সব নতুন শব্দ এখানে একসাথে:

মনে রাখুন

  1. ML service-এর নজরদারি পাঁচ স্তরে: service, ইনপুট, অনুমান, label-সহ মান আর ব্যবসা। ঈদে service সবুজ ছিল (৩,১০১টিতে ০ error) অথচ model নীরবে ভুল — silent failure.
  2. Label-কে তার আসার সময় ধরে জুড়ুন, প্রতিটি দিনের শেষে শুধু তখন জানা তথ্য নিয়ে; নইলে query ভবিষ্যৎ দেখে।
  3. আগে আসা label সময়মতোর দিকে হেলে (censoring bias): ঈদে তিন দিনে জানা দেরির হার ০.১৯৯২, আসল ০.৫৮৮১। পূর্ণ cohort, deadline-নিয়ম আর পূর্ণতার হার দিয়ে সামলান।
  4. Input-এর সংকেত দ্রুত কিন্তু পরোক্ষ (zone PSI ১০ মার্চ), label-এর সংকেত নির্ভরযোগ্য কিন্তু দেরিতে (১৫ মার্চ, deadline-নিয়মে ১৩ মার্চ); AUC কিছুই বলেনি। Label ছাড়া মান অনুমান concept drift-এ অন্ধ।
  5. গড় লুকায়: zone ১-এর recall ০.০১৫৯। Segment ধরে দেখুন, ন্যূনতম নমুনাসহ; alert দিন শুধু নির্ভরযোগ্য আর কাজের সংকেতে, প্রতিটির একজন মালিক রাখুন।

পরের পর্বে: পর্ব ৭৪, Data drift — PSI, KS test আর Evidently: আজকের zone PSI-র পেছনের নকশা — bin-এর সংখ্যা, eps, নমুনার আকার — আর KS test ও Evidently-র drift report, বাজারঘরের একই ঈদের ডেটায়।

আরও পড়ুন · ABCL TECH-এ আপনার পরবর্তী পদক্ষেপ

এই পর্বটি শেয়ার করুন:
এই পর্বে ভুল পেয়েছেন? জানান